| Design, construction and installation of cast
iron scraping plant. |
Acciaierie e Ferriere di
Piombino |
| Spark Box construction for coal converters. |
Acciaierie e Ferriere di Piombino |
| Construction of caps for LF plant. |
Acciaierie e Ferriere di Piombino |
| Periodic maintenance of tank cars and
goods wagons running on the national (FF.SS.) rail network. |
Solvay |
| Maintenance of steelworks machinery
and installations. |
Acciaierie e Ferriere di Piombino |
| Design, construction and installation
of pig iron casting plant. |
Acciaierie e Ferriere di Piombino |
| Construction of 9 ladles for molten
steel; capacity 96 tons. |
Poli Meccanica |
| Design, construction and installation
of coal stacker; capacity 2,500 tons/hour. |
Lucchini siderurgica |
| Machining of cast steel. |
Nuova pignone |
| Design and construction of 12 ladles
for molten steel; capacity 120 tons. |
Lucchini siderurgica |
| Supply of handling tables for cutting
and testing of 12 and 108 m rails. |
Lucchini siderurgica |
| Design and repair of ISPESL approved
pressure vessels. |
ENEL Larderello |
| Design, construction and installation
of 3 cold caps for ISPESL approved coal converters. |
Lucchini siderurgica |
| Design, construction and installation
of waste gas suction plant. |
Acciaierie di Servola |
| Construction and installation of vapour
steam piping in the Sasso Pisano zone. |
ENEL Larderello |
| Overhaul of tunnel building equipment. |
Atlas Copco |
| Design for the construction of second
level nuclear waste containers. |
ENEA |
| Construction and installation of parts
for coal converters. |
Demag |
| Construction of coil moving dolly. |
La Magona d'Italia |
| Construction and installation of oxygen
pressure vessel. |
SOL |
| Design and construction of 4 ladles
for molten steel; capacity 120 tons. |
Lucchini Siderurgica |
| Design, construction and installation
of two-beamed double gantry crane; length 57metres, movement
47 metres, capacity 38.5 tons. |
Lucchini Siderurgica |
| Construction and installation of 1 diverter. |
De Cardenas |
| Construction of boiler chimney; height
37 m, diam. 6m. Fume inlet 21 x 8 m. |
Rosetti Marino |
| Design, construction and delivery of
slab loading quay-side crane. |
Lucchini Siderurgica |
| Design, manifacture and supply of a
45t. raw materials unloader crane. |
Lucchini Siderurgica |
| Design, manifacture and supply of various
models of pressure vessels with PED certification. |
MACTENN |